Background Image
Table of Contents Table of Contents
Previous Page  16 / 98 Next Page
Information
Show Menu
Previous Page 16 / 98 Next Page
Page Background

“And to get that kind of acco-

lade, on one of our first projects

ever, is also pretty special,” he

adds.

The award-winning project in

question is a newly-constructed

single storey 9,000 square foot

facility, built at a cost of $206

per square foot. It was created

to provide much-needed day

care services to local families,

particularly for military person-

nel and shipyard workers.

The clients on that project had

previously outgrown their orig-

inal location in a strip-mall,

and had acquired a long-aban-

doned site once used for vehi-

cle auctions. They approached

Franklin early in the project’s

life, and they worked hand-in-

hand together through the de-

sign, financing, and construc-

tion to ensure the process went

smoothly.

The new ‘I Can’ facility includes

eight classrooms with built-in

AV and security systems, a li-

brary, office space, a kitchen,

a staff break room, and play

areas. The finishes are both

cost and energy-efficient, but

not at the expense of quality.

They include luxury vinyl tile,

level 5 gypsum wallboard, sol-

id surface countertops, vibrant

artwork, energy-efficient win-

dows and appliances, high-SEER

HVAC, and water-saving plumb-

ing fixtures.

The clients were looking to

open their doors quickly, and

FEBRUARY - MARCH 2020

“They’re both

blue-collar, hard-

working guys who

believe that if you

do good work and

treat people right,

then everything

else takes care of

itself. They set

the tone for what

I wanted to do on

my own.”