City of Moncton | 7

developed with one of the goals focusing on

the creation of a detention basin; a system al-

lowing water to collect within a dry basin/

pond and slowly bleeding it off downstream

so they are not flooding anybody else down-

stream. The process has called for review-

ing an area where flooding had occurred,

in turn, hydraulic capacity analysis was per-

formed and RFP’s went out to a consortium

of key integral businesses which included

the Moncton Infrastructure Group. Made

up of Genivar, EXP, Crandall Engineering,

and Hatch Mott McDonald, the group has

been successful through five phases of the

Master plan with another six to go. One of

the objectives of the most recent project is

ensuring that both the combined system and

separated system are handled by a controlled

device which will only permit the amount of

water into their systems that can be handled

without their systems surcharging. Another

integral area, is looking at improvements to

increase sewer capacity issues and better fa-

cilitate drain release (i.e. if there is a sag in