CAPITAL CONSTRUCTION PROJECTS
Since being established 35 years, NEEL-CO
Builders (2014) Ltd. has completed many capital
construction projects. The company’s workforce
specializes in this type of work with knowledge-
able project managers, superintendents, foremen
and construction personnel.
NEEL-CO Builders (2014) Ltd has completed
the following successful projects:
• Highway No. 7, Stave River Bridge Replace-
ment
• David Road, Scott Creek Bridge on Westwood
Plateau
• Almondel Bridge, Cypress Creek – Neelco
launched the steel structure and worked with
All-Span Engineering.
• Old Capilano Bridge Replacement – Neelco
put into place the lateral slide of the existing
through truss bridge spans into the construc-
tion detour position and worked with All-Span
Engineering. Subcontractor for the construc-
tion of the New Capilano Bridge.
• Rodgers Creek
• 99 Mile Overhead No. 1597 Concrete Overlay
& Deck Joint Replacement
• Chilcotin Bridge No. 0010 Concrete Deck
Overlay & Deck Joint Replacement
• Bridge Culvert No. 2 Relining KM 380.7 Alas-
ka Highway – A project that was completed
in advance of the contract completion date.
• Hwy 1 Clanwilliam Overhead No. 0354 Re-
placement – Where Neelco was a subcon-
tractor for the construction of the new bridge.
• Kawkawa Lake Road Bridge Replacement
• Sprout Falls Bridge Hwy No. 4 Port Alberni
• FTG S14 – Hwy 17 at Ladner Trunk Road No.
8224, Hwy 17 O/P at Burns Drive No. 8234 &
Hwy 17 U/P at 72nd Street No. 8240.
• FTG S18 – 5 Creek Bridges
• FTG S31 – Concrete Work for Approaches in
Segments 2, 3 and 4
• Cypress Creek Bridge No. 2498 Rehabilitation
& Seismic Upgrade.
• KM 230 Culvert Replacement, Alaska High-
way
• Port Mann/Highway 1 – Sound Reflective
Walls (Surrey/Langley)
• Nicolum Creek Bridge No. 02828 Rehabilita-
tion
• Rogers Creeks Creek Bridge #00676
• Nimpkish River Bridge No. 02162 Deck Reha-
bilitation
• Golden Ears Connector – Leoran Brook Bridge
– Subcontractor for the bridge structure.
• Evergreen Line Soundwalls – Subcontractor
for Installation of the Soundwalls.
NEEL-CO Builders (2014) Ltd. continues to
deliver high quality capital construction
projects today. Ongoing projects include:
• Malakwa Bridge No. 0871 Replacement –
Where Neelco acts a subcontractor for the
bridge structure.
• Highway No. 95 - Luxor Creek Bridge No.
8486 – Where Neelco also acts as subcon-
tractor for the bridge structure.
• Highway No. 6 – Heart Creek Bridge No. 8519
& Approaches
• Philip Avenue Overpass Project – Where
Neelco is a subcontractor for the Arch Struc-
ture.